Client:

Skyway O & M Corp.

Operator:

Philippine Coastal Stroage and Pipeline Corporation

Services:

Material Supply

  • Sikament R4P1
  • Sikagrout 212
  • Sikadur 31
  • Sikadur 752
  • Sikadur 732
  • Sikagrout 42
  • Sikafloor Epocem 81
Location:

Pasay Off Ramp, Makati

Maintenance works was immediately scheduled due to cracks manifestation on cantiliver beam of Pier Column along Pasay on 3 Ramp on Don Bosco Exit interchange. Immediate repair was schedule due to safety concern of passing motorist on  structural stability of the structure. Structural strengthening using Carbon Fiber was introduce for fast, reliable and high strength characteristic of the materials, also, area was not closed to traffic even repair works are being done.

Technocrete  was awarded to commissioned the repair based on the experienced for the application structural strengthening materials of carbon Fiber and repair of concrete strucuture. Removed and replaced of deteriorated materials system was done.