Client:

Skyway O&M Corp.

Operator:

Skyway O&M Corp.

Services:

Supply & application os structural strengthening

  • Sikagrout 212
  • Sikadur 31
  • Sikadur 752
  • Sikadur 732
  • Sikagrout 42
  • Sikawrap 230C
  • Sikadur 330
Location:

SBMA Subic, Zambales

Maintenance works was immediately scheduled due to cracks manifestation on Column Coping beam of Pier along Dona Soledad Ramp on Bicutan Exit interchange. Immediate repair was scheduled due to safety concern of passing motorist on  structural stability of the structure. Structural strengthening using Carbon Fiber technology was introduce for fast, reliable and high strength characteristic of the materials, also, area was not closed to traffic even repair works are being done above.

Technocrete  was awarded to do the rehabilitation and strengthening of  the damaged  structure as well as repair on structural cracks. Removed and replaced method was done on deteriorated areas.