Client:
First Balfour Corp.
Vestas Corp.
Operator:
EDC Burgos Wind Power Corp.
Services:
Structural strengthening RCBC By-Pass Bridge
- Sikawrap 230C
- Sikadur 330
- Sikadur 752
- Sikadur 31
Location:
Burgos, Ilocos Norte
The 150 MW Burgos Wind Farm is the largest wind power project in Southeast Asia. First Balfour was sub-contracted by Vestas for the civil works of the 150MW wind farm.
Technocrete was contracted to undertake all repair works on RCBC By-Pass Bridge that shows structural defects due to the heavy vehicles passing on the bridge. Structural retrofitting works was done on structural members of the bridge to sustain the load capacity of the moving loads.
Technocrete was chosen because of its outstanding safety record, the ability to mobilize a highly skilled workforce to the project site and its commitment to the highest quality standards.