54 MW SAN LORENZO WIND FARM PROJECT
Technocrete was contracted to undertake critical crack repair works on each foundation before erection of 75m high tubular steel tower hub turbines. Epoxy crack injection and crack repair was done to all foundations to improved structural stability of the structures.
Technocrete was chosen because of its outstanding safety record, the ability to mobilize a highly skilled workforce to the project site and its commitment to the highest quality standards.