Philippine Coastal Storage and Pipeline Corporation Fuel Storage Expansion
The marine terminal known as the POL (petroleum, oil and lubricants) pier occupies an area of 7.2 hectares. It includes 2 Jetties, complete with marine loading arms and stations for berthing to discharge and load various grades of petroleum products. A petroleum laboratory is also located in the terminal. The main jetty can accommodate vessels up to 50,000 DWT while the 2nd Jetty, up to 6,400 DWT capacity.
Technocrete supplied all the materials and material testing as well as technical assistance as per requirement at the site during construction of the expansion project.
STRUCTURAL RETROFITTING of SKYWAY COLUMN COPING BEAM ( Dona Soledad – Bicutan Exit )