Client:

Toreja’s Const. Supply Corp.

Operator:

Department of Public Works & Highways (DPWH)

Services:

Supply and application of Carbon Fiber & Grouting system

  • Sikawrap 230C
  • Sikadur 330
  • Sikagrout 212
Location:

Lobo, Batangas

Biga II  Bridge was the Highest Bridge ( 45m) in Batangas and was undergone on structural and retrofitting works due to aging stage of the structure which is scheduled for periodic repair and maintenance works.

Technocrete was contracted to undertake the critical repair works on column by wrapping 3 layer of carbon fiber from top to bottom of the whole column. Epoxy crack injection and crack repair was done to column  to improved structural stability of the structure.

Technocrete was chosen because of its outstanding safety record, the ability to mobilize a highly skilled workforce to the project site and its commitment to the highest quality standards.