Client:

Marcbilt Const. Corp.

Operator:

Dept. Public Works & Highways ( DPWH )

Services:

Supply and application of Grouting system

  • Sikagrout 212 / 215
  • Sikadur 32
Location:

Bancal, Carmona, Cavite

Bangcal  Bridge was the Highest Bridge ( 25m) in Cavite and was undergone on structural and retrofitting works due to design and load failure on newly erected 4 columns. Upon careful evaluation and design analysis, all 4 column should wrap by carbon fiber to meet the adequate design load.

Technocrete was contracted to undertake the critical repair works on 4 existing new column by wrapping 12 layer of carbon fiber from top to bottom of the whole column. Epoxy crack injection and crack repair was done to 4 column  and improved structural stability of the structure.

Technocrete was chosen because of its outstanding safety record, the ability to mobilize a highly skilled workforce to the project site and its commitment to the highest quality standards.