Client:

Sta. Clara International Corporation

Operator:

AES Philippines

Services:

Supply and application of concrete repair system

  • Sikadur 752
  • Sikadur 31
Location:

Masinloc, Zambales

AES recently finished the constrution its First Battery-based Energy Storage array at Masinloc in Zambales, which will provide 10 MW of interconnected capacity and enhance the reliability of the Luzon grid. The Masinloc Array will use the Advancion® energy storage solution.  It will be one of the first advanced energy storage installations in South East Asia and among the largest in all of Asia.

Technocrete was contracted to undertake all the necessary repair on the rooftop which manifested a structural cracks after having loaded with heavy mechanical machines.

Epoxy crack injection was recommended for the repair system method to make the structure monolithic again.

Technocrete was chosen because of its outstanding safety record, the ability to mobilize a highly skilled workforce to the project site and its commitment to the highest quality standards.